Latest News
-
Sitka Drills 164.0 Metres of 1.83 g/t Gold Including 45.0 Metres of 3.49 g/t Gold and 2.0 Metres of 15.35 g/t Gold at the RC Gold Project, Yukon
-
Sitka Continues to Expand High-Grade Gold Mineralization at the Blackjack Deposit, Drilling 94.5 Metres of 1.62 g/t Gold, Including 2.0 Metres of 11.85 g/t Gold, and an Additional Interval of 197.0 Metres of 1.06 g/t Gold, Including 2.0 Metres of 9.95 g/t Gold, in Hole 125 at Its RC Gold Project, Yukon
-
Sitka Drills 19.3 Metres of 5.04 g/t Gold Within 94.0 M of 1.79 g/t Gold, Expanding High-Grade Gold Zone at the Blackjack Deposit, RC Gold Project, Yukon


